Maine

Maine

← Period: March 2026 →

Total Spending: $13,806,871

STATE CONTRACTING REPORT

Maine March 2026

Maine

⏱ GENERATED 10/26/2026

This report was generated once, at the time listed.

▼ NO MICRO CONTRACTS

Contracts or transactions under $5,000 are not included.

📍 PLACE OF PERFORMANCE

Contracts are counted where the work is done. Awards with no location on record aren't included.

Vendors

69

Contracts

107

Avg Contract

$129,036

Total Spending

$13,806,871

Reporting

Top Vendors

The vendors that received the most money for work performed in Maine in March 2026, across all federal agencies.

  1. MARTINS POINT HEALTH CARE INC

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $196,086,774
  2. BATH IRON WORKS CORPORATION

    HQ: Bath, ME

    Contracts: 9

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 9 ($488.2K) 26 ($78.4M)
    All Locations 1 ($488.2K) 28 ($78.7M)

    $93,349,664
  3. FIBER MATERIALS INC.

    HQ: Biddeford, ME

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($6.0M) 10 ($11.1M)
    All Locations 1 ($6.0M) 10 ($11.1M)

    $5,964,352
  4. ARBOR E & T LLC

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $2,542,779
  5. CAREER SYSTEMS DEVELOPMENT CORPORATION

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $2,315,927
  6. MELGAR FACILITY MAINTENANCE LLC

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $1,665,823
  7. UNITED RENTALS (NORTH AMERICA), INC.

    HQ: Stamford, CT

    Contracts: 2

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 2 ($541.3K) 4 ($1.7M)
    All Locations 1 ($541.3K) 65 ($4.8M)

    $1,612,140
  8. T3I, INC.

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $1,419,975
  9. TRIUMVIRATE ENVIRONMENTAL, LLC

    HQ: Somerville, MA

    Contracts: 3

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 3 ($1.4M) 6 ($1.7M)
    All Locations 3 ($1.4M) 50 ($8.4M)

    $1,418,000
  10. PORTLAND TERMINALS, LLC

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $1,260,000
  11. AROUND THE CLOCK TRANSPORTATION CORPORATION

    HQ: Merrillville, IN

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($1.0M) 1 ($1.0M)
    All Locations 1 ($1.0M) 2 ($1.6M)

    $1,022,450
  12. ORBIS SIBRO INC

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $999,833
  13. ENVIRONMENTAL CHEMICAL CORPORATION

    Contracts: 3

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 3 ($0) 0 ($0)
    All Locations 0 ($0) 0 ($0)

    $882,524
  14. GENERAL DYNAMICS-OTS, INC.

    HQ: Williston, VT

    Contracts: 15

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 15 ($815.6K) 321 ($9.7M)
    All Locations 21 ($2.8M) 452 ($33.1M)

    $815,636
  15. DYNAMIC SYSTEMS INC

    HQ: El Segundo, CA

    Contracts: 1

    CONTRACTS (TOTAL VALUE)
    March 2026 All Time
    In ME 1 ($613.5K) 1 ($613.5K)
    All Locations 12 ($2.3M) 420 ($177.1M)

    $613,473

Top NAICS Codes

The most-awarded NAICS codes for work performed in Maine in March 2026.

Impact

Top Contracts

The highest-value individual contract awards performed in Maine in March 2026.

  1. RECIPIENT

    MARTINS POINT HEALTH CARE INC

    AWARD AMOUNT

    $196,086,774

    Supplemental Agreement for Work Within Scope
    NAICS CODE

    Direct Health And Medical Insurance Carriers • 524114

    PSC CODE

    Medical- Managed Healthcare • Q201

    DESCRIPTION

    SIGNED

    Mar 31, 2026

    KNOWN TRANSACTIONS
    1. 11/26/24 Supplemental Agreement for Work Within Scope +$71,100,000
    2. 1/30/25 Supplemental Agreement for Work Within Scope +$71,600,000
    3. 3/27/25 Funding Only Action +$36,100,000
    4. 5/1/25 Funding Only Action +$150,000,000
    5. 5/7/25 Supplemental Agreement for Work Within Scope $0
    6. 8/21/25 Supplemental Agreement for Work Within Scope +$33,000,000
    7. 9/29/25 Exercise an Option $0
    8. 10/6/25 Funding Only Action +$61,200,000
    9. 10/17/25 Other Administrative Action $0
    10. 10/28/25 Funding Only Action +$700,000
    11. 11/19/25 Funding Only Action +$81,000,000
    12. 12/10/25 Funding Only Action +$16,500,000
    13. 2/4/26 Funding Only Action +$38,900,000
    14. 2/27/26 Funding Only Action +$39,100,000
    15. ▶ 3/31/26 Supplemental Agreement for Work Within Scope +$196,086,774
    16. 6/29/26 Funding Only Action +$4,500,000
  2. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $48,136,191

    Other Administrative Action
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 31, 2026

    KNOWN TRANSACTIONS
    1. 10/23/24 Supplemental Agreement for Work Within Scope +$80,669
    2. 11/7/24 Supplemental Agreement for Work Within Scope +$108,414
    3. 11/22/24 Supplemental Agreement for Work Within Scope +$587,792
    4. 12/4/24 Funding Only Action +$59,342,000
    5. 12/9/24 Supplemental Agreement for Work Within Scope +$152,560
    6. 12/9/24 Other Administrative Action $0
    7. 12/13/24 Funding Only Action +$21,509,000
    8. 12/18/24 Supplemental Agreement for Work Within Scope +$23,872
    9. 1/31/25 Supplemental Agreement for Work Within Scope +$2,737,459
    10. 2/10/25 Supplemental Agreement for Work Within Scope +$2,214
    11. 2/27/25 Supplemental Agreement for Work Within Scope +$393,751
    12. 3/13/25 Supplemental Agreement for Work Within Scope +$2,613
    13. 4/11/25 Supplemental Agreement for Work Within Scope +$24,068
    14. 4/24/25 Supplemental Agreement for Work Within Scope +$210,963
    15. 4/28/25 Change Order +$6,044,572
    16. 5/2/25 Supplemental Agreement for Work Within Scope +$1,404,047
    17. 5/16/25 Funding Only Action +$121,515,396
    18. 5/27/25 Supplemental Agreement for Work Within Scope +$27,341
    19. 6/6/25 Supplemental Agreement for Work Within Scope +$2,045,961
    20. 6/17/25 Supplemental Agreement for Work Within Scope +$291,213
    21. 6/18/25 Supplemental Agreement for Work Within Scope +$115,722
    22. 6/23/25 Other Administrative Action $0
    23. 6/25/25 Supplemental Agreement for Work Within Scope +$115,510
    24. 7/15/25 Other Administrative Action +$5,257,484
    25. 7/31/25 Exercise an Option +$1,519,369,714
    26. 8/4/25 Other Administrative Action $0
    27. 8/8/25 Supplemental Agreement for Work Within Scope +$51,489
    28. 8/15/25 Supplemental Agreement for Work Within Scope +$7,236
    29. 8/20/25 Supplemental Agreement for Work Within Scope +$10,670
    30. 8/26/25 Other Administrative Action $0
    31. 8/29/25 Supplemental Agreement for Work Within Scope +$11,228
    32. 9/4/25 Other Administrative Action $0
    33. 9/5/25 Supplemental Agreement for Work Within Scope +$53,871
    34. 9/18/25 Supplemental Agreement for Work Within Scope +$746
    35. 9/25/25 Supplemental Agreement for Work Within Scope +$69,373
    36. 10/15/25 Other Administrative Action $0
    37. 10/22/25 Supplemental Agreement for Work Within Scope +$1,699,706
    38. 11/4/25 Supplemental Agreement for Work Within Scope -$11,799
    39. 12/1/25 Supplemental Agreement for Work Within Scope +$102,697
    40. 12/11/25 Supplemental Agreement for Work Within Scope +$1,504,372
    41. 12/15/25 Supplemental Agreement for Work Within Scope +$28,658
    42. 12/19/25 Other Administrative Action $0
    43. 12/23/25 Supplemental Agreement for Work Within Scope +$92,060
    44. 1/30/26 Supplemental Agreement for Work Within Scope +$247,849
    45. 2/10/26 Supplemental Agreement for Work Within Scope -$63,193
    46. 3/10/26 Other Administrative Action +$70,000
    47. 3/20/26 Other Administrative Action $0
    48. ▶ 3/31/26 Other Administrative Action +$48,136,191
    49. 5/6/26 Exercise an Option +$1,514,091,399
    50. 6/10/26 Other Administrative Action $0
    51. 6/15/26 Other Administrative Action $0
    52. 6/29/26 Other Administrative Action $0
  3. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $11,770,960

    Exercise an Option
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 11, 2026

    KNOWN TRANSACTIONS
    1. 10/24/24 Change Order +$236,439
    2. 10/28/24 Funding Only Action +$1,399,109
    3. 11/1/24 Change Order +$1,495,829
    4. 11/8/24 Change Order +$57,858
    5. 11/22/24 Change Order +$939,648
    6. 11/27/24 Change Order +$368,296
    7. 12/6/24 Change Order +$750,000
    8. 12/13/24 Change Order +$876,690
    9. 12/19/24 Change Order +$355,137
    10. 1/8/25 Other Administrative Action $0
    11. 1/10/25 Funding Only Action +$622,282
    12. 1/16/25 Change Order +$1,160,255
    13. 1/17/25 Change Order +$106,117
    14. 1/22/25 Funding Only Action +$608,220
    15. 1/23/25 Change Order +$79,659
    16. 1/31/25 Change Order +$38,991
    17. 1/31/25 Change Order +$459,807
    18. 2/6/25 Change Order +$928,193
    19. 2/11/25 Change Order +$289,345
    20. 2/14/25 Change Order +$1,290,104
    21. 2/21/25 Exercise an Option +$5,785,915
    22. 2/27/25 Change Order +$210,521
    23. 2/28/25 Change Order +$309,452
    24. 3/7/25 Change Order +$1,143,240
    25. 3/12/25 Change Order +$516,812
    26. 3/13/25 Change Order +$420,291
    27. 3/21/25 Change Order +$1,488,137
    28. 3/26/25 Change Order +$2,033,982
    29. 4/3/25 Funding Only Action -$55,551
    30. 4/8/25 Funding Only Action +$162,690
    31. 4/9/25 Change Order +$240,885
    32. 4/11/25 Change Order +$851,606
    33. 4/14/25 Change Order +$40,952
    34. 4/14/25 Other Administrative Action $0
    35. 4/17/25 Change Order +$2,138,355
    36. 4/21/25 Funding Only Action -$29,904
    37. 4/25/25 Change Order +$20,337
    38. 5/1/25 Change Order +$3,026,195
    39. 5/6/25 Funding Only Action +$6,586,056
    40. 5/16/25 Change Order +$2,556,028
    41. 5/22/25 Funding Only Action +$262,365
    42. 5/23/25 Change Order +$1,817,061
    43. 5/30/25 Funding Only Action -$169,896
    44. 5/30/25 Change Order +$2,184,661
    45. 6/6/25 Change Order +$1,056,209
    46. 6/12/25 Change Order +$1,562,981
    47. 6/18/25 Funding Only Action +$16,958
    48. 6/23/25 Change Order +$93,947
    49. 6/24/25 Funding Only Action +$566,612
    50. 6/27/25 Change Order +$4,003,415
    51. 7/3/25 Change Order +$4,321,845
    52. 7/11/25 Change Order +$4,540,937
    53. 7/18/25 Change Order +$2,199,541
    54. 7/23/25 Funding Only Action +$1,002,496
    55. 7/25/25 Funding Only Action +$208,244
    56. 7/28/25 Change Order +$1,405,574
    57. 8/1/25 Change Order +$1,988,962
    58. 8/8/25 Supplemental Agreement for Work Within Scope +$1,578,128
    59. 8/15/25 Change Order +$523,091
    60. 8/25/25 Change Order +$1,027,322
    61. 8/27/25 Change Order +$293,210
    62. 8/29/25 Change Order +$234,666
    63. 9/4/25 Funding Only Action +$537,956
    64. 9/5/25 Change Order +$2,069,654
    65. 9/9/25 Change Order +$225,000
    66. 9/15/25 Funding Only Action +$230,261
    67. 9/18/25 Change Order +$103,880
    68. 9/23/25 Change Order +$4,208,425
    69. 9/25/25 Change Order +$2,363,370
    70. 9/30/25 Change Order +$3,658,692
    71. 10/17/25 Supplemental Agreement for Work Within Scope +$330,000
    72. 10/23/25 Change Order +$475,140
    73. 11/13/25 Change Order +$440,337
    74. 11/18/25 Funding Only Action +$2,096,966
    75. 11/21/25 Change Order +$1,974,041
    76. 11/25/25 Funding Only Action +$683,190
    77. 12/4/25 Funding Only Action +$7,500
    78. 12/5/25 Change Order +$567,467
    79. 12/10/25 Funding Only Action +$1,919,663
    80. 12/11/25 Funding Only Action +$162,690
    81. 12/12/25 Change Order +$721,374
    82. 12/18/25 Change Order +$357,190
    83. 12/23/25 Change Order +$119,575
    84. 1/9/26 Change Order +$92,893
    85. 1/15/26 Change Order +$939,989
    86. 1/21/26 Funding Only Action +$595,316
    87. 1/22/26 Change Order +$549,061
    88. 1/29/26 Funding Only Action +$205,098
    89. 1/30/26 Change Order +$308,948
    90. 2/6/26 Change Order +$1,302,398
    91. 2/11/26 Funding Only Action +$100,000
    92. 2/13/26 Funding Only Action +$250,000
    93. 2/13/26 Change Order +$593,071
    94. 2/20/26 Change Order +$824,655
    95. 2/23/26 Change Order +$197,424
    96. 2/24/26 Change Order +$1,781,239
    97. 2/26/26 Funding Only Action +$33,373
    98. 2/27/26 Change Order +$1,108,176
    99. 3/5/26 Change Order +$3,225,663
    100. ▶ 3/11/26 Exercise an Option +$11,770,960
  4. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $9,698,635

    Other Administrative Action
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 31, 2026

    KNOWN TRANSACTIONS
    1. 10/28/24 Supplemental Agreement for Work Within Scope +$286,287
    2. 11/7/24 Supplemental Agreement for Work Within Scope +$84,021
    3. 11/18/24 Other Administrative Action $0
    4. 11/26/24 Supplemental Agreement for Work Within Scope +$38,338
    5. 12/4/24 Other Administrative Action $0
    6. 12/9/24 Supplemental Agreement for Work Within Scope -$304,024
    7. 12/10/24 Other Administrative Action +$3,135,000
    8. 12/19/24 Supplemental Agreement for Work Within Scope -$192,045
    9. 12/20/24 Supplemental Agreement for Work Within Scope +$43,000
    10. 1/7/25 Supplemental Agreement for Work Within Scope +$383,055
    11. 1/29/25 Supplemental Agreement for Work Within Scope +$8,316
    12. 2/3/25 Other Administrative Action $0
    13. 2/12/25 Supplemental Agreement for Work Within Scope +$3,183
    14. 2/14/25 Other Administrative Action $0
    15. 2/18/25 Supplemental Agreement for Work Within Scope +$5,368,468
    16. 2/26/25 Supplemental Agreement for Work Within Scope +$1,069,476
    17. 2/27/25 Supplemental Agreement for Work Within Scope +$158,252
    18. 3/10/25 Other Administrative Action +$5,300,000
    19. 3/11/25 Supplemental Agreement for Work Within Scope -$165,129
    20. 3/14/25 Other Administrative Action +$10,509,000
    21. 3/26/25 Other Administrative Action $0
    22. 3/26/25 Supplemental Agreement for Work Within Scope +$1,296,426
    23. 3/27/25 Other Administrative Action +$90,000
    24. 3/28/25 Supplemental Agreement for Work Within Scope +$163,313
    25. 4/11/25 Supplemental Agreement for Work Within Scope +$86,019
    26. 4/16/25 Supplemental Agreement for Work Within Scope +$300,626
    27. 4/23/25 Supplemental Agreement for Work Within Scope +$7,452
    28. 5/29/25 Supplemental Agreement for Work Within Scope -$432,432
    29. 6/6/25 Supplemental Agreement for Work Within Scope +$73,750
    30. 6/16/25 Other Administrative Action $0
    31. 6/17/25 Supplemental Agreement for Work Within Scope +$2,014,475
    32. 6/17/25 Other Administrative Action +$570,000
    33. 6/23/25 Other Administrative Action $0
    34. 6/25/25 Supplemental Agreement for Work Within Scope +$723,636
    35. 6/27/25 Supplemental Agreement for Work Within Scope +$257,612
    36. 7/10/25 Supplemental Agreement for Work Within Scope +$292,887
    37. 7/24/25 Supplemental Agreement for Work Within Scope +$1,793,794
    38. 8/4/25 Other Administrative Action +$50,600,000
    39. 8/14/25 Supplemental Agreement for Work Within Scope +$530,968
    40. 8/20/25 Supplemental Agreement for Work Within Scope +$901,371
    41. 8/21/25 Supplemental Agreement for Work Within Scope +$56,948
    42. 9/2/25 Supplemental Agreement for Work Within Scope +$15,968
    43. 9/8/25 Supplemental Agreement for Work Within Scope +$61,232
    44. 9/11/25 Supplemental Agreement for Work Within Scope +$6,155
    45. 9/15/25 Other Administrative Action +$2,433,190
    46. 9/16/25 Funding Only Action +$1,520,000
    47. 9/23/25 Other Administrative Action $0
    48. 9/25/25 Other Administrative Action $0
    49. 9/29/25 Other Administrative Action +$25,879,112
    50. 10/2/25 Supplemental Agreement for Work Within Scope +$1,387
    51. 10/6/25 Other Administrative Action $0
    52. 10/16/25 Supplemental Agreement for Work Within Scope -$57,178
    53. 10/20/25 Supplemental Agreement for Work Within Scope +$219,052
    54. 10/22/25 Supplemental Agreement for Work Within Scope +$11,520,988
    55. 10/27/25 Supplemental Agreement for Work Within Scope $0
    56. 10/30/25 Other Administrative Action +$814,000
    57. 10/31/25 Supplemental Agreement for Work Within Scope -$205,970
    58. 11/6/25 Supplemental Agreement for Work Within Scope +$145,593
    59. 11/6/25 Supplemental Agreement for Work Within Scope +$21,171
    60. 11/20/25 Supplemental Agreement for Work Within Scope +$453,729
    61. 12/1/25 Supplemental Agreement for Work Within Scope +$6,894,704
    62. 12/3/25 Other Administrative Action $0
    63. 12/10/25 Supplemental Agreement for Work Within Scope +$304,577
    64. 12/15/25 Supplemental Agreement for Work Within Scope -$481,095
    65. 12/16/25 Funding Only Action +$3,980,000
    66. 12/19/25 Other Administrative Action $0
    67. 12/23/25 Supplemental Agreement for Work Within Scope +$266,411
    68. 1/20/26 Supplemental Agreement for Work Within Scope -$64,219
    69. 1/27/26 Supplemental Agreement for Work Within Scope +$1,238,474
    70. 1/29/26 Supplemental Agreement for Work Within Scope -$198,356
    71. 2/26/26 Supplemental Agreement for Work Within Scope -$61,371
    72. 2/27/26 Supplemental Agreement for Work Within Scope +$125,381
    73. 3/5/26 Supplemental Agreement for Work Within Scope +$111,548
    74. 3/10/26 Other Administrative Action +$225,000
    75. 3/12/26 Other Administrative Action +$180,000
    76. 3/13/26 Supplemental Agreement for Work Within Scope +$1,163,096
    77. 3/20/26 Supplemental Agreement for Work Within Scope +$1,546,011
    78. 3/20/26 Other Administrative Action $0
    79. 3/26/26 Supplemental Agreement for Work Within Scope +$1,645,596
    80. 3/27/26 Other Administrative Action $0
    81. ▶ 3/31/26 Other Administrative Action +$9,698,635
    82. 4/14/26 Supplemental Agreement for Work Within Scope +$3,015,370
    83. 4/23/26 Supplemental Agreement for Work Within Scope +$3,585,899
    84. 4/30/26 Supplemental Agreement for Work Within Scope +$187,500
    85. 5/1/26 Supplemental Agreement for Work Within Scope +$42,050
    86. 5/5/26 Supplemental Agreement for Work Within Scope -$2,963
    87. 5/7/26 Other Administrative Action +$2,390,000
    88. 6/2/26 Supplemental Agreement for Work Within Scope -$246,913
    89. 6/5/26 Supplemental Agreement for Work Within Scope -$52,384
    90. 6/9/26 Other Administrative Action -$6,192,049
    91. 6/10/26 Other Administrative Action $0
    92. 6/12/26 Supplemental Agreement for Work Within Scope +$180,814
    93. 6/15/26 Other Administrative Action $0
    94. 6/16/26 Other Administrative Action $0
    95. 6/22/26 Supplemental Agreement for Work Within Scope +$118,683
  5. RECIPIENT

    FIBER MATERIALS INC.

    AWARD AMOUNT

    $5,964,352

    Base Award
    PERFORMED IN

    Biddeford, ME

    NAICS CODE

    Research And Development In The Physical, Engineering, And Life Sciences (except Nanotechnology And Biotechnology) • 541715

    PSC CODE

    National Defense R&d Services; Defense-related Activities; Experimental Development • AC33

    DESCRIPTION

    Antenna window production expansion

    Funding Office

    DCSO PHILADELPHIA

    SIGNED

    Mar 17, 2026

    CONTRACT PERIOD

    3/17/26 → 11/30/28

    KNOWN TRANSACTIONS
    1. 3/26/26 Other Administrative Action $0
    Total Spending To-Date: $5,964,352
  6. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $3,225,663

    Change Order
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 5, 2026

    KNOWN TRANSACTIONS
    1. 10/24/24 Change Order +$236,439
    2. 10/28/24 Funding Only Action +$1,399,109
    3. 11/1/24 Change Order +$1,495,829
    4. 11/8/24 Change Order +$57,858
    5. 11/22/24 Change Order +$939,648
    6. 11/27/24 Change Order +$368,296
    7. 12/6/24 Change Order +$750,000
    8. 12/13/24 Change Order +$876,690
    9. 12/19/24 Change Order +$355,137
    10. 1/8/25 Other Administrative Action $0
    11. 1/10/25 Funding Only Action +$622,282
    12. 1/16/25 Change Order +$1,160,255
    13. 1/17/25 Change Order +$106,117
    14. 1/22/25 Funding Only Action +$608,220
    15. 1/23/25 Change Order +$79,659
    16. 1/31/25 Change Order +$38,991
    17. 1/31/25 Change Order +$459,807
    18. 2/6/25 Change Order +$928,193
    19. 2/11/25 Change Order +$289,345
    20. 2/14/25 Change Order +$1,290,104
    21. 2/21/25 Exercise an Option +$5,785,915
    22. 2/27/25 Change Order +$210,521
    23. 2/28/25 Change Order +$309,452
    24. 3/7/25 Change Order +$1,143,240
    25. 3/12/25 Change Order +$516,812
    26. 3/13/25 Change Order +$420,291
    27. 3/21/25 Change Order +$1,488,137
    28. 3/26/25 Change Order +$2,033,982
    29. 4/3/25 Funding Only Action -$55,551
    30. 4/8/25 Funding Only Action +$162,690
    31. 4/9/25 Change Order +$240,885
    32. 4/11/25 Change Order +$851,606
    33. 4/14/25 Change Order +$40,952
    34. 4/14/25 Other Administrative Action $0
    35. 4/17/25 Change Order +$2,138,355
    36. 4/21/25 Funding Only Action -$29,904
    37. 4/25/25 Change Order +$20,337
    38. 5/1/25 Change Order +$3,026,195
    39. 5/6/25 Funding Only Action +$6,586,056
    40. 5/16/25 Change Order +$2,556,028
    41. 5/22/25 Funding Only Action +$262,365
    42. 5/23/25 Change Order +$1,817,061
    43. 5/30/25 Funding Only Action -$169,896
    44. 5/30/25 Change Order +$2,184,661
    45. 6/6/25 Change Order +$1,056,209
    46. 6/12/25 Change Order +$1,562,981
    47. 6/18/25 Funding Only Action +$16,958
    48. 6/23/25 Change Order +$93,947
    49. 6/24/25 Funding Only Action +$566,612
    50. 6/27/25 Change Order +$4,003,415
    51. 7/3/25 Change Order +$4,321,845
    52. 7/11/25 Change Order +$4,540,937
    53. 7/18/25 Change Order +$2,199,541
    54. 7/23/25 Funding Only Action +$1,002,496
    55. 7/25/25 Funding Only Action +$208,244
    56. 7/28/25 Change Order +$1,405,574
    57. 8/1/25 Change Order +$1,988,962
    58. 8/8/25 Supplemental Agreement for Work Within Scope +$1,578,128
    59. 8/15/25 Change Order +$523,091
    60. 8/25/25 Change Order +$1,027,322
    61. 8/27/25 Change Order +$293,210
    62. 8/29/25 Change Order +$234,666
    63. 9/4/25 Funding Only Action +$537,956
    64. 9/5/25 Change Order +$2,069,654
    65. 9/9/25 Change Order +$225,000
    66. 9/15/25 Funding Only Action +$230,261
    67. 9/18/25 Change Order +$103,880
    68. 9/23/25 Change Order +$4,208,425
    69. 9/25/25 Change Order +$2,363,370
    70. 9/30/25 Change Order +$3,658,692
    71. 10/17/25 Supplemental Agreement for Work Within Scope +$330,000
    72. 10/23/25 Change Order +$475,140
    73. 11/13/25 Change Order +$440,337
    74. 11/18/25 Funding Only Action +$2,096,966
    75. 11/21/25 Change Order +$1,974,041
    76. 11/25/25 Funding Only Action +$683,190
    77. 12/4/25 Funding Only Action +$7,500
    78. 12/5/25 Change Order +$567,467
    79. 12/10/25 Funding Only Action +$1,919,663
    80. 12/11/25 Funding Only Action +$162,690
    81. 12/12/25 Change Order +$721,374
    82. 12/18/25 Change Order +$357,190
    83. 12/23/25 Change Order +$119,575
    84. 1/9/26 Change Order +$92,893
    85. 1/15/26 Change Order +$939,989
    86. 1/21/26 Funding Only Action +$595,316
    87. 1/22/26 Change Order +$549,061
    88. 1/29/26 Funding Only Action +$205,098
    89. 1/30/26 Change Order +$308,948
    90. 2/6/26 Change Order +$1,302,398
    91. 2/11/26 Funding Only Action +$100,000
    92. 2/13/26 Funding Only Action +$250,000
    93. 2/13/26 Change Order +$593,071
    94. 2/20/26 Change Order +$824,655
    95. 2/23/26 Change Order +$197,424
    96. 2/24/26 Change Order +$1,781,239
    97. 2/26/26 Funding Only Action +$33,373
    98. 2/27/26 Change Order +$1,108,176
    99. ▶ 3/5/26 Change Order +$3,225,663
    100. 3/11/26 Exercise an Option +$11,770,960
  7. RECIPIENT

    CAREER SYSTEMS DEVELOPMENT CORPORATION

    AWARD AMOUNT

    $2,315,927

    Funding Only Action
    NAICS CODE

    Other Technical And Trade Schools • 611519

    PSC CODE

    Education/training- Vocational/technical • U006

    DESCRIPTION

    SIGNED

    Mar 31, 2026

    KNOWN TRANSACTIONS
    1. 10/24/24 Supplemental Agreement for Work Within Scope +$671,410
    2. 10/25/24 Exercise an Option +$5,453,301
    3. 1/22/25 Other Administrative Action $0
    4. 2/4/25 Other Administrative Action $0
    5. 2/27/25 Funding Only Action -$279,687
    6. 5/14/25 Funding Only Action +$2,055,327
    7. 6/18/25 Supplemental Agreement for Work Within Scope $0
    8. 6/24/25 Supplemental Agreement for Work Within Scope $0
    9. 7/15/25 Supplemental Agreement for Work Within Scope $0
    10. 7/15/25 Funding Only Action +$2,866,105
    11. 8/6/25 Supplemental Agreement for Work Within Scope $0
    12. 8/28/25 Supplemental Agreement for Work Within Scope -$2,812
    13. 9/24/25 Funding Only Action +$393,886
    14. 9/26/25 Exercise an Option +$2,037,954
    15. 11/21/25 Other Administrative Action $0
    16. 12/9/25 Supplemental Agreement for Work Within Scope -$200,230
    17. 12/30/25 Funding Only Action +$2,540,647
    18. 2/9/26 Funding Only Action +$45,750
    19. ▶ 3/31/26 Funding Only Action +$2,315,927
    20. 4/21/26 Funding Only Action +$60,000
    21. 5/1/26 Supplemental Agreement for Work Within Scope $0
    22. 6/1/26 Other Administrative Action -$0
    23. 6/23/26 Funding Only Action +$65,095
    24. 6/30/26 Other Administrative Action -$0
    25. 7/15/26 Funding Only Action +$3,590,532
  8. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $2,064,145

    Funding Only Action
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 10, 2026

    KNOWN TRANSACTIONS
    1. 10/23/24 Funding Only Action +$9,760,975
    2. 10/24/24 Supplemental Agreement for Work Within Scope +$630,481
    3. 10/29/24 Funding Only Action +$4,342,593
    4. 10/31/24 Supplemental Agreement for Work Within Scope +$90,912
    5. 11/5/24 Funding Only Action +$3,952,552
    6. 11/7/24 Supplemental Agreement for Work Within Scope +$4,939,278
    7. 11/13/24 Other Administrative Action $0
    8. 11/13/24 Funding Only Action +$720,532
    9. 11/14/24 Supplemental Agreement for Work Within Scope +$1,825,449
    10. 11/20/24 Funding Only Action +$2,414,469
    11. 11/21/24 Supplemental Agreement for Work Within Scope +$95,631
    12. 11/26/24 Funding Only Action +$407,932
    13. 11/27/24 Supplemental Agreement for Work Within Scope +$370,106
    14. 12/5/24 Supplemental Agreement for Work Within Scope +$248,896
    15. 12/9/24 Funding Only Action +$1,135,345
    16. 12/12/24 Supplemental Agreement for Work Within Scope +$424,007
    17. 12/13/24 Other Administrative Action $0
    18. 12/18/24 Funding Only Action +$231,839
    19. 12/20/24 Supplemental Agreement for Work Within Scope +$3,732,053
    20. 12/23/24 Funding Only Action +$374,093
    21. 1/8/25 Supplemental Agreement for Work Within Scope +$17,018
    22. 1/8/25 Funding Only Action +$248,012
    23. 1/13/25 Other Administrative Action $0
    24. 1/14/25 Funding Only Action +$598,522
    25. 1/16/25 Supplemental Agreement for Work Within Scope +$2,705,847
    26. 1/22/25 Funding Only Action +$7,563,438
    27. 1/23/25 Supplemental Agreement for Work Within Scope +$2,868,333
    28. 1/28/25 Funding Only Action +$1,903,528
    29. 1/30/25 Supplemental Agreement for Work Within Scope +$667,885
    30. 2/4/25 Funding Only Action +$3,741,187
    31. 2/6/25 Supplemental Agreement for Work Within Scope +$525,124
    32. 2/11/25 Funding Only Action +$1,821,137
    33. 2/12/25 Supplemental Agreement for Work Within Scope +$4,081,910
    34. 2/19/25 Funding Only Action +$1,558,178
    35. 2/20/25 Supplemental Agreement for Work Within Scope +$327,261
    36. 2/25/25 Funding Only Action +$68,881
    37. 2/27/25 Supplemental Agreement for Work Within Scope +$347,919
    38. 3/5/25 Funding Only Action -$1,044,072
    39. 3/6/25 Supplemental Agreement for Work Within Scope +$532,812
    40. 3/10/25 Funding Only Action +$1,615,912
    41. 3/14/25 Supplemental Agreement for Work Within Scope +$394,172
    42. 3/18/25 Funding Only Action +$994,182
    43. 3/24/25 Supplemental Agreement for Work Within Scope +$1,148,319
    44. 3/25/25 Funding Only Action +$18,100
    45. 4/1/25 Funding Only Action +$1,084,220
    46. 4/3/25 Supplemental Agreement for Work Within Scope +$1,384,334
    47. 4/8/25 Funding Only Action +$150,132
    48. 4/10/25 Supplemental Agreement for Work Within Scope +$116,798
    49. 4/11/25 Funding Only Action -$833,512
    50. 4/11/25 Other Administrative Action $0
    51. 4/17/25 Supplemental Agreement for Work Within Scope +$415,405
    52. 4/23/25 Funding Only Action +$4,297,366
    53. 4/24/25 Supplemental Agreement for Work Within Scope +$93,242
    54. 4/29/25 Funding Only Action +$2,707,453
    55. 5/2/25 Supplemental Agreement for Work Within Scope +$1,170,341
    56. 5/5/25 Funding Only Action -$168,569
    57. 5/8/25 Supplemental Agreement for Work Within Scope +$571,676
    58. 5/15/25 Supplemental Agreement for Work Within Scope +$175,740
    59. 5/20/25 Funding Only Action +$550,770
    60. 5/20/25 Exercise an Option +$374,560
    61. 5/22/25 Supplemental Agreement for Work Within Scope +$1,185,701
    62. 5/23/25 Funding Only Action +$1,878,346
    63. 5/23/25 Funding Only Action +$1,999,994
    64. 5/29/25 Supplemental Agreement for Work Within Scope +$3,731,296
    65. 6/4/25 Funding Only Action +$784,816
    66. 6/11/25 Funding Only Action +$3,708,136
    67. 6/11/25 Funding Only Action +$541,311
    68. 6/12/25 Supplemental Agreement for Work Within Scope +$3,576,878
    69. 6/13/25 Other Administrative Action $0
    70. 6/16/25 Funding Only Action +$2,131,562
    71. 6/17/25 Supplemental Agreement for Work Within Scope +$1,524,173
    72. 6/24/25 Funding Only Action +$9,320,449
    73. 7/1/25 Funding Only Action +$20,190,537
    74. 7/2/25 Supplemental Agreement for Work Within Scope +$97,713
    75. 7/7/25 Funding Only Action +$53,843
    76. 7/8/25 Funding Only Action +$935,754
    77. 7/11/25 Supplemental Agreement for Work Within Scope +$781,144
    78. 7/11/25 Other Administrative Action $0
    79. 7/16/25 Funding Only Action +$3,851,221
    80. 7/17/25 Supplemental Agreement for Work Within Scope +$1,465,845
    81. 7/23/25 Funding Only Action +$4,389,285
    82. 7/24/25 Supplemental Agreement for Work Within Scope +$222,539
    83. 7/30/25 Funding Only Action +$8,762,503
    84. 7/31/25 Supplemental Agreement for Work Within Scope +$2,326,035
    85. 8/5/25 Funding Only Action +$3,886,147
    86. 8/7/25 Supplemental Agreement for Work Within Scope +$3,559,609
    87. 8/12/25 Funding Only Action +$2,158,476
    88. 8/14/25 Supplemental Agreement for Work Within Scope +$398,484
    89. 8/19/25 Funding Only Action -$955,394
    90. 8/21/25 Supplemental Agreement for Work Within Scope +$1,910,194
    91. 8/26/25 Funding Only Action +$2,622,085
    92. 9/2/25 Supplemental Agreement for Work Within Scope +$3,923,947
    93. 9/3/25 Funding Only Action -$763,882
    94. 9/4/25 Supplemental Agreement for Work Within Scope +$608,716
    95. 9/9/25 Funding Only Action +$1,655,247
    96. 9/11/25 Supplemental Agreement for Work Within Scope +$581,583
    97. 9/16/25 Funding Only Action +$1,407,440
    98. 9/18/25 Supplemental Agreement for Work Within Scope +$2,058,738
    99. 9/23/25 Funding Only Action +$2,749,103
    100. 9/25/25 Supplemental Agreement for Work Within Scope +$2,737,802
  9. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $2,038,094

    Supplemental Agreement for Work Within Scope
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 20, 2026

    KNOWN TRANSACTIONS
    1. 10/23/24 Funding Only Action +$9,760,975
    2. 10/24/24 Supplemental Agreement for Work Within Scope +$630,481
    3. 10/29/24 Funding Only Action +$4,342,593
    4. 10/31/24 Supplemental Agreement for Work Within Scope +$90,912
    5. 11/5/24 Funding Only Action +$3,952,552
    6. 11/7/24 Supplemental Agreement for Work Within Scope +$4,939,278
    7. 11/13/24 Other Administrative Action $0
    8. 11/13/24 Funding Only Action +$720,532
    9. 11/14/24 Supplemental Agreement for Work Within Scope +$1,825,449
    10. 11/20/24 Funding Only Action +$2,414,469
    11. 11/21/24 Supplemental Agreement for Work Within Scope +$95,631
    12. 11/26/24 Funding Only Action +$407,932
    13. 11/27/24 Supplemental Agreement for Work Within Scope +$370,106
    14. 12/5/24 Supplemental Agreement for Work Within Scope +$248,896
    15. 12/9/24 Funding Only Action +$1,135,345
    16. 12/12/24 Supplemental Agreement for Work Within Scope +$424,007
    17. 12/13/24 Other Administrative Action $0
    18. 12/18/24 Funding Only Action +$231,839
    19. 12/20/24 Supplemental Agreement for Work Within Scope +$3,732,053
    20. 12/23/24 Funding Only Action +$374,093
    21. 1/8/25 Supplemental Agreement for Work Within Scope +$17,018
    22. 1/8/25 Funding Only Action +$248,012
    23. 1/13/25 Other Administrative Action $0
    24. 1/14/25 Funding Only Action +$598,522
    25. 1/16/25 Supplemental Agreement for Work Within Scope +$2,705,847
    26. 1/22/25 Funding Only Action +$7,563,438
    27. 1/23/25 Supplemental Agreement for Work Within Scope +$2,868,333
    28. 1/28/25 Funding Only Action +$1,903,528
    29. 1/30/25 Supplemental Agreement for Work Within Scope +$667,885
    30. 2/4/25 Funding Only Action +$3,741,187
    31. 2/6/25 Supplemental Agreement for Work Within Scope +$525,124
    32. 2/11/25 Funding Only Action +$1,821,137
    33. 2/12/25 Supplemental Agreement for Work Within Scope +$4,081,910
    34. 2/19/25 Funding Only Action +$1,558,178
    35. 2/20/25 Supplemental Agreement for Work Within Scope +$327,261
    36. 2/25/25 Funding Only Action +$68,881
    37. 2/27/25 Supplemental Agreement for Work Within Scope +$347,919
    38. 3/5/25 Funding Only Action -$1,044,072
    39. 3/6/25 Supplemental Agreement for Work Within Scope +$532,812
    40. 3/10/25 Funding Only Action +$1,615,912
    41. 3/14/25 Supplemental Agreement for Work Within Scope +$394,172
    42. 3/18/25 Funding Only Action +$994,182
    43. 3/24/25 Supplemental Agreement for Work Within Scope +$1,148,319
    44. 3/25/25 Funding Only Action +$18,100
    45. 4/1/25 Funding Only Action +$1,084,220
    46. 4/3/25 Supplemental Agreement for Work Within Scope +$1,384,334
    47. 4/8/25 Funding Only Action +$150,132
    48. 4/10/25 Supplemental Agreement for Work Within Scope +$116,798
    49. 4/11/25 Funding Only Action -$833,512
    50. 4/11/25 Other Administrative Action $0
    51. 4/17/25 Supplemental Agreement for Work Within Scope +$415,405
    52. 4/23/25 Funding Only Action +$4,297,366
    53. 4/24/25 Supplemental Agreement for Work Within Scope +$93,242
    54. 4/29/25 Funding Only Action +$2,707,453
    55. 5/2/25 Supplemental Agreement for Work Within Scope +$1,170,341
    56. 5/5/25 Funding Only Action -$168,569
    57. 5/8/25 Supplemental Agreement for Work Within Scope +$571,676
    58. 5/15/25 Supplemental Agreement for Work Within Scope +$175,740
    59. 5/20/25 Funding Only Action +$550,770
    60. 5/20/25 Exercise an Option +$374,560
    61. 5/22/25 Supplemental Agreement for Work Within Scope +$1,185,701
    62. 5/23/25 Funding Only Action +$1,878,346
    63. 5/23/25 Funding Only Action +$1,999,994
    64. 5/29/25 Supplemental Agreement for Work Within Scope +$3,731,296
    65. 6/4/25 Funding Only Action +$784,816
    66. 6/11/25 Funding Only Action +$3,708,136
    67. 6/11/25 Funding Only Action +$541,311
    68. 6/12/25 Supplemental Agreement for Work Within Scope +$3,576,878
    69. 6/13/25 Other Administrative Action $0
    70. 6/16/25 Funding Only Action +$2,131,562
    71. 6/17/25 Supplemental Agreement for Work Within Scope +$1,524,173
    72. 6/24/25 Funding Only Action +$9,320,449
    73. 7/1/25 Funding Only Action +$20,190,537
    74. 7/2/25 Supplemental Agreement for Work Within Scope +$97,713
    75. 7/7/25 Funding Only Action +$53,843
    76. 7/8/25 Funding Only Action +$935,754
    77. 7/11/25 Supplemental Agreement for Work Within Scope +$781,144
    78. 7/11/25 Other Administrative Action $0
    79. 7/16/25 Funding Only Action +$3,851,221
    80. 7/17/25 Supplemental Agreement for Work Within Scope +$1,465,845
    81. 7/23/25 Funding Only Action +$4,389,285
    82. 7/24/25 Supplemental Agreement for Work Within Scope +$222,539
    83. 7/30/25 Funding Only Action +$8,762,503
    84. 7/31/25 Supplemental Agreement for Work Within Scope +$2,326,035
    85. 8/5/25 Funding Only Action +$3,886,147
    86. 8/7/25 Supplemental Agreement for Work Within Scope +$3,559,609
    87. 8/12/25 Funding Only Action +$2,158,476
    88. 8/14/25 Supplemental Agreement for Work Within Scope +$398,484
    89. 8/19/25 Funding Only Action -$955,394
    90. 8/21/25 Supplemental Agreement for Work Within Scope +$1,910,194
    91. 8/26/25 Funding Only Action +$2,622,085
    92. 9/2/25 Supplemental Agreement for Work Within Scope +$3,923,947
    93. 9/3/25 Funding Only Action -$763,882
    94. 9/4/25 Supplemental Agreement for Work Within Scope +$608,716
    95. 9/9/25 Funding Only Action +$1,655,247
    96. 9/11/25 Supplemental Agreement for Work Within Scope +$581,583
    97. 9/16/25 Funding Only Action +$1,407,440
    98. 9/18/25 Supplemental Agreement for Work Within Scope +$2,058,738
    99. 9/23/25 Funding Only Action +$2,749,103
    100. 9/25/25 Supplemental Agreement for Work Within Scope +$2,737,802
  10. RECIPIENT

    BATH IRON WORKS CORPORATION

    AWARD AMOUNT

    $1,898,975

    Change Order
    NAICS CODE

    Ship Building And Repairing • 336611

    PSC CODE

    Combat Ships And Landing Vessels • 1905

    DESCRIPTION

    SIGNED

    Mar 13, 2026

    KNOWN TRANSACTIONS
    1. 10/24/24 Change Order +$236,439
    2. 10/28/24 Funding Only Action +$1,399,109
    3. 11/1/24 Change Order +$1,495,829
    4. 11/8/24 Change Order +$57,858
    5. 11/22/24 Change Order +$939,648
    6. 11/27/24 Change Order +$368,296
    7. 12/6/24 Change Order +$750,000
    8. 12/13/24 Change Order +$876,690
    9. 12/19/24 Change Order +$355,137
    10. 1/8/25 Other Administrative Action $0
    11. 1/10/25 Funding Only Action +$622,282
    12. 1/16/25 Change Order +$1,160,255
    13. 1/17/25 Change Order +$106,117
    14. 1/22/25 Funding Only Action +$608,220
    15. 1/23/25 Change Order +$79,659
    16. 1/31/25 Change Order +$38,991
    17. 1/31/25 Change Order +$459,807
    18. 2/6/25 Change Order +$928,193
    19. 2/11/25 Change Order +$289,345
    20. 2/14/25 Change Order +$1,290,104
    21. 2/21/25 Exercise an Option +$5,785,915
    22. 2/27/25 Change Order +$210,521
    23. 2/28/25 Change Order +$309,452
    24. 3/7/25 Change Order +$1,143,240
    25. 3/12/25 Change Order +$516,812
    26. 3/13/25 Change Order +$420,291
    27. 3/21/25 Change Order +$1,488,137
    28. 3/26/25 Change Order +$2,033,982
    29. 4/3/25 Funding Only Action -$55,551
    30. 4/8/25 Funding Only Action +$162,690
    31. 4/9/25 Change Order +$240,885
    32. 4/11/25 Change Order +$851,606
    33. 4/14/25 Change Order +$40,952
    34. 4/14/25 Other Administrative Action $0
    35. 4/17/25 Change Order +$2,138,355
    36. 4/21/25 Funding Only Action -$29,904
    37. 4/25/25 Change Order +$20,337
    38. 5/1/25 Change Order +$3,026,195
    39. 5/6/25 Funding Only Action +$6,586,056
    40. 5/16/25 Change Order +$2,556,028
    41. 5/22/25 Funding Only Action +$262,365
    42. 5/23/25 Change Order +$1,817,061
    43. 5/30/25 Funding Only Action -$169,896
    44. 5/30/25 Change Order +$2,184,661
    45. 6/6/25 Change Order +$1,056,209
    46. 6/12/25 Change Order +$1,562,981
    47. 6/18/25 Funding Only Action +$16,958
    48. 6/23/25 Change Order +$93,947
    49. 6/24/25 Funding Only Action +$566,612
    50. 6/27/25 Change Order +$4,003,415
    51. 7/3/25 Change Order +$4,321,845
    52. 7/11/25 Change Order +$4,540,937
    53. 7/18/25 Change Order +$2,199,541
    54. 7/23/25 Funding Only Action +$1,002,496
    55. 7/25/25 Funding Only Action +$208,244
    56. 7/28/25 Change Order +$1,405,574
    57. 8/1/25 Change Order +$1,988,962
    58. 8/8/25 Supplemental Agreement for Work Within Scope +$1,578,128
    59. 8/15/25 Change Order +$523,091
    60. 8/25/25 Change Order +$1,027,322
    61. 8/27/25 Change Order +$293,210
    62. 8/29/25 Change Order +$234,666
    63. 9/4/25 Funding Only Action +$537,956
    64. 9/5/25 Change Order +$2,069,654
    65. 9/9/25 Change Order +$225,000
    66. 9/15/25 Funding Only Action +$230,261
    67. 9/18/25 Change Order +$103,880
    68. 9/23/25 Change Order +$4,208,425
    69. 9/25/25 Change Order +$2,363,370
    70. 9/30/25 Change Order +$3,658,692
    71. 10/17/25 Supplemental Agreement for Work Within Scope +$330,000
    72. 10/23/25 Change Order +$475,140
    73. 11/13/25 Change Order +$440,337
    74. 11/18/25 Funding Only Action +$2,096,966
    75. 11/21/25 Change Order +$1,974,041
    76. 11/25/25 Funding Only Action +$683,190
    77. 12/4/25 Funding Only Action +$7,500
    78. 12/5/25 Change Order +$567,467
    79. 12/10/25 Funding Only Action +$1,919,663
    80. 12/11/25 Funding Only Action +$162,690
    81. 12/12/25 Change Order +$721,374
    82. 12/18/25 Change Order +$357,190
    83. 12/23/25 Change Order +$119,575
    84. 1/9/26 Change Order +$92,893
    85. 1/15/26 Change Order +$939,989
    86. 1/21/26 Funding Only Action +$595,316
    87. 1/22/26 Change Order +$549,061
    88. 1/29/26 Funding Only Action +$205,098
    89. 1/30/26 Change Order +$308,948
    90. 2/6/26 Change Order +$1,302,398
    91. 2/11/26 Funding Only Action +$100,000
    92. 2/13/26 Funding Only Action +$250,000
    93. 2/13/26 Change Order +$593,071
    94. 2/20/26 Change Order +$824,655
    95. 2/23/26 Change Order +$197,424
    96. 2/24/26 Change Order +$1,781,239
    97. 2/26/26 Funding Only Action +$33,373
    98. 2/27/26 Change Order +$1,108,176
    99. 3/5/26 Change Order +$3,225,663
    100. 3/11/26 Exercise an Option +$11,770,960

Top De-obligations

The largest contract de-obligations (spending reductions or cancellations) on work performed in Maine in March 2026.

  1. RECIPIENT

    TETRA TECH EC, INC.

    DE-OBLIGATION AMOUNT

    -$1,376,028

    Close Out
    PERFORMED IN

    Brunswick, ME

    NAICS CODE

    Remediation Services • 562910

    PSC CODE

    Environmental Systems Protection- Environmental Remediation • F108

    DESCRIPTION

    Igf::ot::igf environmental remedial action contract

    Funding Office

    NAVFACSYSCOM ATLANTIC

    SIGNED

    Mar 6, 2026

    CONTRACT PERIOD

    8/29/13 → 6/30/22

    KNOWN TRANSACTIONS
    1. ▶ 3/6/26 Close Out -$1,376,028
    Total Spending To-Date: $12,225,739
  2. RECIPIENT

    COMCAST GOVERNMENT SERVICES LLC

    DE-OBLIGATION AMOUNT

    -$22,183

    Legal Contract Cancellation
    PERFORMED IN

    Bath, ME

    NAICS CODE

    Wired Telecommunications Carriers • 517311

    PSC CODE

    It And Telecom - Network: Satellite Communications And Telecom Access Services • DG11

    DESCRIPTION

    Ceg1000002ebm

    Funding Office

    NAVIFOR

    SIGNED

    Mar 17, 2026

    CONTRACT PERIOD

    4/12/21 → 4/16/26

    KNOWN TRANSACTIONS
    1. ▶ 3/17/26 Legal Contract Cancellation -$22,183
    Total Spending To-Date: $48,970
  3. RECIPIENT

    COMCAST GOVERNMENT SERVICES LLC

    DE-OBLIGATION AMOUNT

    -$22,124

    Legal Contract Cancellation
    PERFORMED IN

    Cutler, ME

    NAICS CODE

    Wired Telecommunications Carriers • 517311

    PSC CODE

    It And Telecom - Network: Satellite Communications And Telecom Access Services • DG11

    DESCRIPTION

    Ceg1000047ebm

    Funding Office

    NAVIFOR

    SIGNED

    Mar 20, 2026

    CONTRACT PERIOD

    4/12/21 → 4/19/26

    KNOWN TRANSACTIONS
    1. ▶ 3/20/26 Legal Contract Cancellation -$22,124
    Total Spending To-Date: $26,929
  4. RECIPIENT

    STONE & ASSOCIATES INC

    DE-OBLIGATION AMOUNT

    -$9,652

    Funding Only Action
    PERFORMED IN

    Kennebunk, ME

    NAICS CODE

    Administrative Management And General Management Consulting Services • 541611

    PSC CODE

    Support- Administrative: Other • R699

    DESCRIPTION

    Fiscal year 2023 mep summit support services

    Funding Office

    DEPT OF COMMERCE NIST

    Object Classes

    25.2: Other services from non-Federal sources

    Program Activities

    0002: HOLLINGS MANUFACTURING EXTENSION PARTNERSHIP

    SIGNED

    Mar 23, 2026

    CONTRACT PERIOD

    10/1/22 → 10/31/23

    KNOWN TRANSACTIONS
    1. ▶ 3/23/26 Funding Only Action -$9,652
    Total Spending To-Date: $134,514
  5. RECIPIENT

    GENERAL DYNAMICS-OTS, INC.

    DE-OBLIGATION AMOUNT

    -$4,265

    Other Administrative Action
    PERFORMED IN

    Saco, ME

    NAICS CODE

    Mechanical Power Transmission Equipment Manufacturing • 333613

    PSC CODE

    Miscellaneous Power Transmission Equipment • 3040

    DESCRIPTION

    8511804017!gearshaft,multiple

    Funding Office

    DLA LAND AND MARITIME

    SIGNED

    Mar 12, 2026

    CONTRACT PERIOD

    12/11/25 → 1/15/27

    KNOWN TRANSACTIONS
    1. 12/11/25 Base Award $17,059
    Total Spending To-Date: $12,794

Top Agencies

The federal agencies that obligated the most for work performed in Maine in March 2026.


  1. $11,271,854

  2. $1,631,217

  3. $201,016

  4. $184,680

  5. $171,895

  6. $153,367

  7. $125,902

  8. $66,940

Performance Locations

The cities in Maine where the most federal contract work was performed in March 2026.

Top Cities

  1. Biddeford, ME

    1 contracts


    $5,964,352
  2. Kittery, ME

    24 contracts


    $3,740,882
  3. Augusta, ME

    11 contracts


    $1,653,023
  4. Saco, ME

    16 contracts


    $825,786
  5. Portland, ME

    2 contracts


    $532,211
  6. Bath, ME

    3 contracts


    $482,171
  7. Bridgton, ME

    2 contracts


    $333,693
  8. Sidney, ME

    3 contracts


    $327,397
  9. Westbrook, ME

    10 contracts


    $309,092
  10. Gray, ME

    1 contracts


    $195,000

Vendor headquarters

Where the vendors doing federal work in Maine in March 2026 list their primary business address — local, or brought in from elsewhere.

Top States

  1. Maine

    41 contracts


    $8,363,886
  2. Massachusetts

    8 contracts


    $1,651,428
  3. Indiana

    1 contracts


    $1,022,450
  4. Vermont

    15 contracts


    $815,636
  5. California

    4 contracts


    $657,488

Top Cities

  1. Biddeford, ME

    1 contracts


    $5,964,352
  2. Somerville, MA

    3 contracts


    $1,418,000
  3. Merrillville, IN

    1 contracts


    $1,022,450
  4. Williston, VT

    15 contracts


    $815,636
  5. El Segundo, CA

    1 contracts


    $613,473

Try Meter Search

Meter Search helps you finds the right vendors, right now.

Search Now →