All Reports Available
Total Reports: 22
⏱ UPDATED 3/10/2026
This report was last updated on the date listed.
▼ NO MICRO CONTRACTS
Contracts or transactions under $5,000 are not included.
🚫 NOT OFFICIAL
Meter uses government data, but isn't an official source.
The total contracting spend by the National Aeronautics and Space Administration, including breakdown by known subagencies.
Top 8 NAICS codes by spending at National Aeronautics and Space Administration over time.
Monthly federal spending reports for National Aeronautics and Space Administration.
| Report Period | Total Spending | Top Buzzwords |
|---|---|---|
March 2026 |
$7,309,429 | basement hvac |
March 2026 |
$77,940,087 | reduction test center funded 4 jpss |
January 2026 |
$39,675,877 | gears intern intern program gears |
December 2025 |
$129,718,330 | mentorcliq renewal 80tech |
November 2025 |
$269,922,729 | response satellite csda program csda |
October 2025 |
$7,500,644 | mipss configuration marshall integrated services mipss |
September 2025 |
$1,040,783,215 | sbir 1 sbir lunar |
August 2025 |
$1,427,517,432 | synergy achieving achieving consolidated kennedy space |
July 2025 |
$182,248,010 | services keops possible modifications ltvs capabilities |
May 2025 |
$59,706,583 | aside 42 site supplies instruments space |
April 2025 |
$80,136,818 | site supplies aside 42 instruments space |
March 2025 |
$37,405,430 | renewed 3 sfnp phase national partnership |
March 2025 |
$38,981,435 | icecube sstp smallsat maui hi.in |
December 2024 |
$23,793,797 | contamination modeling dust contamination attached salesforce |
November 2024 |
$36,148,764 | specification guided microshutter arrays transfer 82 |
October 2024 |
$15,150,236 | transfer acuity acuity edge uwms operations |
September 2024 |
$152,258,589 | space biology plant habitat advanced plant |
August 2024 |
$39,990,854 | experiment modules drosophila 2 levels |
July 2024 |
$56,735,054 | bring mars sample back assurance maintenance |
June 2024 |
$33,502,935 | upgrades phases wtps saas pooled |
May 2024 |
$4,055,970 | space missions surface test standard modular |
April 2024 |
$53,185,316 | mthp mthp modification next coronagraph |
March 2026 2026: reduction test, center funded, 4 jpss
January 2026 2026: gears intern, intern program, gears
December 2025 2025: mentorcliq renewal, 80tech
November 2025 2025: response satellite, csda program, csda
October 2025 2025: mipss configuration, marshall integrated, services mipss
September 2025 2025: sbir 1, sbir, lunar
August 2025 2025: synergy achieving, achieving consolidated, kennedy space
July 2025 2025: services keops, possible modifications, ltvs capabilities
May 2025 2025: aside 42, site supplies, instruments space
April 2025 2025: site supplies, aside 42, instruments space
March 2025 2025: icecube, sstp smallsat, maui hi.in
December 2024 2024: contamination modeling, dust contamination, attached salesforce
November 2024 2024: specification guided, microshutter arrays, transfer 82
October 2024 2024: transfer acuity, acuity edge, uwms operations
September 2024 2024: space biology, plant habitat, advanced plant
August 2024 2024: experiment modules, drosophila, 2 levels
July 2024 2024: bring mars, sample back, assurance maintenance
June 2024 2024: upgrades phases, wtps, saas pooled
May 2024 2024: space missions, surface test, standard modular
April 2024 2024: mthp, mthp modification, next coronagraph
The vendors that have received the most dollars from National Aeronautics and Space Administration across all available report periods.