All Reports Available
Total Reports: 32
⏱ UPDATED 3/10/2026
This report was last updated on the date listed.
▼ NO MICRO CONTRACTS
Contracts or transactions under $5,000 are not included.
🚫 NOT OFFICIAL
Meter uses official government data, but is not itself an official source.
Monthly spending trend for Federal Highway Administration.
Top 8 NAICS codes by spending at Federal Highway Administration over time.
Monthly federal spending reports for Federal Highway Administration.
| Report Period | Total Spending | Top Buzzwords |
|---|---|---|
March 2026 |
$15,737,541 | |
March 2026 |
$75,277,802 | |
January 2026 |
$100,212,065 | core telecommunication which mandates mandates construction |
December 2025 |
$73,640,774 | |
November 2025 |
$62,338,648 | fhwa perform scoping geometric design |
October 2025 |
$20,415,585 | leica customer mount blue entitled innovative |
September 2025 |
$114,439,315 | vado road vado heron project consists |
August 2025 |
$46,945,147 | efficiency safety approach work 1 cedar |
August 2025 |
$46,945,147 | efficiency safety approach work 1 cedar |
July 2025 |
$70,455,910 | converting design eebacs masterworks |
May 2025 |
$43,452,351 | rehab madison flex cucm intersection designs |
April 2025 |
$22,498,669 | lcdo lower 2 hoover portal 2 |
April 2025 |
$22,498,669 | lcdo lower 2 hoover portal 2 |
April 2025 |
$22,498,669 | lcdo lower 2 hoover portal 2 |
March 2025 |
$34,862,701 | investigations drilling roadway recondition flap umatill |
March 2025 |
$34,862,701 | investigations drilling roadway recondition flap umatill |
March 2025 |
$25,424,020 | santaquin canyon erfo uinta 2 santaquin |
December 2024 |
$3,143,589 | transportation decision fhwa legal claims administrative |
December 2024 |
$3,143,589 | transportation decision fhwa legal claims administrative |
November 2024 |
$12,329,823 | columbia pike |
October 2024 |
$462,664 | |
September 2024 |
$20,025,430 | 1 meers environmental authority railway system |
September 2024 |
$20,025,430 | 1 meers environmental authority railway system |
August 2024 |
$21,261,810 | under dot's sewp equipment 1 geophysical |
August 2024 |
$21,261,810 | under dot's sewp equipment 1 geophysical |
August 2024 |
$21,261,810 | under dot's sewp equipment 1 geophysical |
July 2024 |
$5,238,742 | entrance ramps treatment asphalt nestucca river |
July 2024 |
$5,238,742 | entrance ramps treatment asphalt nestucca river |
July 2024 |
$5,238,742 | entrance ramps treatment asphalt nestucca river |
June 2024 |
$30,505,663 | ipic dashboard additional under ocio |
May 2024 |
$3,503,255 | inspectors fhwa ftfw laat bridge inspectors |
April 2024 |
$5,400,517 |
January 2026 2026: core telecommunication, which mandates, mandates construction
November 2025 2025: fhwa, perform scoping, geometric design
October 2025 2025: leica customer, mount blue, entitled innovative
September 2025 2025: vado road, vado heron, project consists
August 2025 2025: efficiency safety, approach work, 1 cedar
July 2025 2025: converting design, eebacs, masterworks
May 2025 2025: rehab madison, flex cucm, intersection designs
April 2025 2025: lcdo lower, 2 hoover, portal 2
March 2025 2025: santaquin canyon, erfo uinta, 2 santaquin
December 2024 2024: transportation decision, fhwa legal, claims administrative
November 2024 2024: columbia pike
September 2024 2024: 1 meers, environmental authority, railway system
August 2024 2024: under dot's, sewp equipment, 1 geophysical
July 2024 2024: entrance ramps, treatment asphalt, nestucca river
June 2024 2024: ipic, dashboard additional, under ocio
May 2024 2024: inspectors fhwa, ftfw laat, bridge inspectors
The vendors that have received the most dollars from Federal Highway Administration across all available report periods.